Introduction The era of Intelligent Buildings is approaching, thanks to technical advancements that are making science fiction a reality. Buildings are becoming more intelligent and automated. They ha...
Project Overview In a Multiplex there were about 23 Amplifiers linked to a switch and wanted to read data on BMS (Building Management System). Initial SituationEach of the Amplifier had 7 channels a...
Project overview One of a very well know building has 200 energy meters located on different floors and building management authority wants to get data of all the energy meters on central Building Man...
Project Overview In a Data Center there were about 4-5 VFDs (Variable Frequency Drive) and they needed to be controlled and monitored using MQTT protocol. Initial SituationVFDs were looped on RS485 ...
Project Overview Lighting system on metro stations is normally controlled using a standalone controller. The controller supported 3rd party integration using Telnet and it was required to control the...
Project Overview On one of our renowned client’s (Zydus Oncology Center – Ahmedabad) site, LCP (Liquid Cooling Package) and CMC Cooling systems Panels were installed. Client wanted to get the data...
Project overview Telecom offices in Pune are located in Lohegaon. There is a managed tower complex with state of the art facilities and houses several other multi national companies. The Telecom offic...
Project OverviewThere were around 237 well-known brand VAVs’ in a Bank Corporate Building distributed unequally on different floors and wanted it to communicate its data on BMS.Initial Situation...
Project Overview Site had an installation of Schneider EM6400 Energy meters for monitoring energy consumption related parameters like Voltage, Current, Power etc. The customer wanted to monitor these ...